CS Molds | Header
Contact CS Molds — Shenzhen Changsheng Mould Ltd.
Contact CS Molds · Shenzhen Changsheng Mould

Talk Directly to the Engineers Who Will Run Your Program.

Since 2005, in-house mold making and 41 injection machines under one roof in Shenzhen — send your drawings for precision mold, injection molding or IC Tray projects and get engineer-reviewed feedback within one working day.

01 · Response
Within 1 working day, reviewed by engineers
02 · Confidentiality
NDA signed before any file exchange
03 · Free DFM
Manufacturability review at no cost
Ways to Reach Us

Four Direct Channels — All Reach the Same Team.

Whether it's a mold RFQ, an IC Tray project or a mold transfer inquiry, every channel below lands with Aric (our English-speaking business lead) and the engineering team — no sales gatekeeper, no lead-scoring queue.

@
Email · Best for Files
zheng.cheng@jzt.hk

Attach STEP/IGES/PDF files up to 25 MB. Engineering-reviewed reply within one working day.

Aric (Zheng Cheng)
Open Email
Phone · Direct Line
+86 188 2345 2455

Call during China office hours (GMT+8). English-speaking on every call — no translation delay.

Aric (Zheng Cheng)
Call Now
WhatsApp · Fast Reply
+86 188 2345 2455

For quick questions across time zones. Send a photo of the drawing or part directly — media messages supported.

Aric (Zheng Cheng)
Chat on WhatsApp
RFQ Form · Structured
Submit Below ↓

The fastest path when your project has clear volume, timing and material specs — form routes straight to engineering.

Reviewed by Aric & Engineering
Go to Form
Send Your Project

What to Include in Your First Message.

The clearer the input, the faster the engineering answer. Everything below is optional — even a rough sketch and a target volume gets you a useful first reply.

01
3D file · STEP, IGES, STP or Parasolid
02
2D drawing with dimensions and tolerances
03
Material requirement or preferred resin grade
04
Annual volume and target program timing
Business Hours
Mon–Fri · 9:00–18:00 (GMT+8)
Extended Coverage
US/EU windows via email & WhatsApp
Response SLA
Within 1 working day, engineer-reviewed
RFQ Form

Submit Your Project Details

Fields marked with * are required. Files up to 50 MB per upload.
Factory Location

Come See the Equipment Running Your Program.

Plant visits are welcomed — we arrange airport pickup, hotel booking and English-speaking technical staff for a walkthrough of the mold shop, injection floor and quality lab. Remote video walkthroughs available when travel isn't on the table yet.

CS Molds · Shenzhen Baoan · Songgang
Head Office & Factory

Shenzhen Changsheng Mould Ltd.

Integrity Builds Trust · Win-Win Partnerships
以诚立信 · 共创共赢
Address
No. 4 Tianyang 6th Road, Dongfang Community,
Songgang Sub-district, Baoan District,
Shenzhen, Guangdong, China 518105
(Xinhaoshun Zhizao Innovation Park, Building 2, Unit 101)
Nearest Airports
Shenzhen Bao'an Int'l (SZX) · 40 min by car
Hong Kong Int'l (HKG) · 2 hr by car / ferry
Visitor Support
Airport pickup, hotel booking & translator arranged — tell Aric your travel dates and we handle the rest.
Schedule a Factory Visit
Proven Projects

Real Programs Across Our Three Business Lines.

Three representative programs covering precision molds, injection molding and IC Tray OEM — customer names withheld under NDA, but the engineering path and measured result are exactly as delivered.

Semiconductor IC Tray project
IC Tray
Semiconductor OEM
Taiwan
2024

Precision IC Tray with 99.7% Incoming Pass Rate

Semiconductor tray required tight pocket dimensional stability across humidity swings; selected low-moisture-absorption engineering resin, controlled cooling profile, and 100% CMM sampling on pocket geometry per lot — adopted as primary IC Tray supplier and scaled to 5 additional device families.

Outcome
99.7% Pass Rate
Personal care 2K double-shot molding project
Personal Care · 2K
Electric Toothbrush OEM
Europe
2024

2K Handle with Zero Cosmetic Reject on Trial Run

Handheld personal-care device with rigid-soft two-shot handle for grip; custom 2K mold on a 160T double-shot machine, PC + TPE material stack with matched shrink rates — first-shot dimensional approval, zero cosmetic reject on the trial run, sustained production for over 18 months.

Outcome
First-Shot Approval
Injection mold halves for a large plastic housing
Automotive
Tier-1 Auto
Germany
2023

Under-Hood Housing Warpage Fixed on Mold Transfer

Housing transferred from previous supplier with 0.4mm warpage failing customer-line assembly; redesigned cooling channels, adjusted gate location and re-tooled core inserts — warpage reduced to 0.08mm across all cavities, first-shot approval within 4 weeks of transfer, program launched on original schedule.

Outcome
Warpage ↓ 80%
Have a mold, injection or IC Tray program with a specific engineering challenge? Send the drawing and target — we'll respond with an approach and lead time within one working day.
Discuss Your Project
What Customers Say

Feedback From Engineering & Procurement Teams.

Real feedback from customers who have shipped programs with CS Molds — names withheld under NDA, but roles, industries and program contexts are exactly as stated for reference verification.

"

Their DFM review caught a wall-thickness issue on our IC Tray pocket that would have caused warpage in production. That single review saved us a full mold-revision cycle and pulled our program launch back on schedule.

Head of Packaging Engineering
Semiconductor OEM · Taiwan
IC Tray · 2024
"

We transferred a legacy mold from another supplier and expected weeks of rework. CS Molds returned a condition report in five days, adjusted the cooling channels, and had first-shot approval within three weeks. Production has been stable since.

Senior Purchasing Manager
Tier-1 Automotive Supplier · Germany
Mold Transfer · 2023
"

Their engineering team pushed back on our original gate design for the 2K handle and explained exactly why. We revised, they tooled, and the trial parts hit tolerance on the first shot. That's the kind of upfront honesty we look for in a supplier.

Product Development Lead
Personal Care OEM · Europe
2K Molding · 2024
Full customer references available under NDA once program context is aligned
Certifications & Compliance

Documented Systems Your Auditors Can Verify.

A full certification stack backed by material compliance and customer-specific documentation — ready for regulated programs without a scramble when your quality auditor asks for evidence.

IATF
Certified

IATF 16949:2016

International Automotive Task Force quality management system for automotive-grade programs — PPAP-ready documentation and lot-level traceability supported for tier-one supplier requirements.

Scope
Automotive
ISO
9001
Certified

ISO 9001:2015

Quality Management System covering mold engineering, injection production, inspection and delivery — the baseline your procurement team expects on file for any qualified supplier.

Scope
Full Facility
ISO
14001
Certified

ISO 14001:2015

Environmental Management System covering resource use, emissions and waste management — meeting the sustainability procurement requirements increasingly written into overseas OEM contracts.

Scope
Environment
CN
KEY
Recognized

China Key Mold Export Enterprise

Government-designated key enterprise for mold export — official recognition of manufacturing capability and export track record within China's precision mold industry.

Scope
Mold Export
Need a specific certificate or a customer-specific compliance document? Tell us what your quality team needs on file — we'll confirm what we hold and share current certificates for your audit trail.
Request Certificates
Contact FAQ

Answers Before You Even Send the First Email.

The questions overseas buyers ask most often when getting in touch with CS Molds — so you know what to expect before you write to us.

01How quickly will I get a reply to my RFQ?
Within one working day (GMT+8). The initial reply is reviewed by Aric plus the engineering team and includes DFM feedback on your drawing, an indicative lead time, and any clarifying questions we need to build a proper quotation — not a generic "we received your inquiry" auto-response.
02Do you sign NDAs before I send drawings?
Yes. NDA execution before any CAD or drawing exchange is our default for overseas OEM inquiries. If you don't have a standard NDA, we can provide ours for your legal team to review. Turnaround is usually one working day.
03Is the DFM review really free?
Yes — DFM review is included with every RFQ, at no cost and with no commitment. It covers wall thickness, draft angles, gate location, weld line risks, tolerance feasibility and material recommendations. For IC Tray projects, it also covers pocket dimensions, flatness/warpage risk and ESD/surface treatment feasibility.
04Can I engage you for only mold making, only injection molding, or both?
All three. Our three business lines are (1) precision injection mold manufacturing, (2) plastic injection molding mass production, and (3) IC Tray mold & OEM production. You can engage any of them individually — build a mold only, take a customer-supplied mold into production, or run a full end-to-end program from DFM through mass production. Because the mold shop and injection floor are in the same facility, moving between them stays under one accountable team.
05Do you handle 2K / double-shot molding?
Yes. We operate double-shot machines including Haitian 160T, Fu Chun Shin (FCS) 160T and BabyPlast micro-molding units, alongside our single-color machines from 30T to 380T. Common 2K applications we run today include personal care handles, medical device housings, automotive functional parts and electronics enclosures with rigid-soft or dual-colour material combinations.
06Can I visit the factory in Shenzhen or request a remote video walkthrough?
Both. In-person plant visits at our Baoan/Songgang site are welcomed — we arrange Shenzhen Bao'an (SZX) or Hong Kong (HKG) airport pickup, hotel booking and English-speaking technical staff. For remote audits, we run live workshop video feeds and can walk your team through the tool room, injection floor, quality lab and material storage in real time — no travel needed.
07Do you handle shipping, customs and quality documentation?
Yes — FOB, CIF and DDP options across sea and air freight with export documentation prepared by our team. Quality documentation supported includes ISIR, dimensional reports, material certificates and IATF 16949-aligned PPAP-style submissions for automotive programs. Tell us your program requirements at RFQ stage and we build the workflow around them.
08What if my project is still at the concept stage?
That's actually the best time to talk. Early-stage projects benefit most from DFM input — we can advise on material selection, gate strategy, cavity count, whether 2K makes sense, and tooling cost trade-offs before you commit design decisions that are expensive to change later. Send a sketch and volume estimate to Aric; we'll take it from there.
Have a question we didn't cover? Send it directly to Aric — we'll answer honestly, even if it means telling you we're not the right fit for your program.
Ask Our Team